Washington State Projects II

Free Flow Power’s second group of Projects in Washington State consists of four diversion Projects to be constructed on four smaller waterways in the Eastern part of the state: Martin Creek, Barclay Creek, Ruth Creek, and Swamp Creek. As diversion Projects, these Projects do not use existing dams to generate electricity; rather a portion of the river’s flow is redirected into a pipe, at the bottom of which sits a powerhouse. After passing through the powerhouses’ turbines, water is returned to its original course.  The four Projects will produce 19.1 MW and 76.2 GWh annually.

PROJECTS
Project Name State Waterway FERC Docket Number
Barclay Creek WA Barclay Creek P-13864
Martin Creek WA Martin Creek P-13865
Ruth Creek WA Ruth Creek P-13866
Swamp Creek WA Swamp Creek P-13867